| Project Details |
| Work Type | Repairs |
|---|
| Phase | Design |
|---|
| Limits | SR 699 (Gulf Boulevard) from SR 682 (Pinellas Bayway) to SR 688 (Walsingham Road) |
|---|
| Length | 9.35 miles |
|---|
| City | Madeira Beach St. Petersburg |
|---|
| County | Pinellas |
|---|
| Road | Gulf Boulevard SR 699 |
|---|
This project will repair damage along SR 699 (Gulf Boulevard) from SR 682 (Pinellas Bayway) to SR 688 (Walsingham Road).
Contact Information
Design Manager
Helena Ly
813-975-3690
Helena.Ly@dot.state.fl.us
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
Drainage inlet top repairs
Drainage inlet top replacements
Sidewalk repairs
Pavement repairs
Driveway repairs
Pavement marking restoration
Sign repairs
Sign replacement
Construction is anticipated to begin Fall 2026.