===== PAGE 1 =====
# SR 693 (66th Street) Resurfacing from Tyrone Boulevard to Park Boulevard 451239-1-52-01
| Project Details |
| Work Type | Milling and Resurfacing |
| Phase | Design |
| Limits | SR 693 (66th Street) from North Tyrone Boulevard to Park Boulevard North |
| Length | 3.2 miles |
| City | St. Petersburg |
| County | Pinellas |
| Road | 66th Street SR 693 |
| Contact Information |
| Design Manager |
| Indike Ratnayake | 813-975-3678 |
| Liyanage.Ratnayake@dot.state.fl. |
| US |
| Media Contact |
| Kayla Mejia | 813-975-6060 |
| Kayla.Mejia@dot.state.fl.us |
hn's Pass Village Google hardwalk
Map data ©2026 INEGI
## About
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of SR 693 (66th Street) in Pinellas County.
In addition to resurfacing, this project also includes installing midblock crossings at 41st Avenue N, 58th Avenue N, and 68th Avenue N.
Construction is currently anticipated to begin in spring of 2029.