SR 54 Repaving from Little Road to Marathon Road 443784-1-52-01
| Project Details |
| Work Type | Repaving |
|---|
| Phase | Completed |
|---|
| Limits | From west of Little Road to Marathon Road |
|---|
| Project Start | February 16, 2024 |
|---|
| Length | 3.4 miles |
|---|
| City | Trinity |
|---|
| County | Pasco |
|---|
| Road | SR 54 |
|---|
| Construction Cost | $12.7 million |
|---|
| Estimated Completion | Summer 2025 |
|---|
| Contractor | Ajax Paving Industries of Florida LLC |
|---|
As of June 30, 2025, all construction activities associated with this project have been completed.
This project repaved SR 54 between Little Road and Marathon Road.
The existing sidewalk on the north side of SR 54 between Starkey Boulevard and Success Drive and between Success Dr. and Marathon Road was widened to eight feet. Pedestrian features were added at the Hospital Boulevard intersection and a new mid block pedestrian crossing across SR 54 was built east of Starkey Boulevard.
Contact Information
Project Information
John McShaffrey 813-975-6930
john.mcshaffrey@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us