## SR 44 (Gulf to Lake Hwy) Repaving from Norvell Bryant Hwy to west of N Lopp Point 432582-1-52-01
| Project Details |
| Work Type | Repaving |
| Phase | Completed |
| Limits | from Norvell\nBryant Hwy to\nwest of N. Lopp\nPoint |
| Project Start | October 14,\n2023 |
| Length | 2.4 miles |
| City | Crystal River\nLecanto |
| County | Citrus |
| Road | Gulf To Lake\nHighway (Citrus)\nSR 44 |
| Construction Cost | $5.9 million |
| Estimated Completion | September 16,\n2024 |
| Contractor | Superior Asphalt, Inc. |
| Contact Information |
| Project Information |
| John McShaffrey\n813-975-6930\nroadwork@dot.state.fl.us |
| Media Contact |
| Kayla Mejia\n813-975-6060\nKayla.Mejia@dot.state.fl.us |
44
Map data ©2024 Google
## About
## This project was accepted from the contractor as completed on October 17, 2024
This project milled and resurfaced SR 44 (Gulf to Lake Highway) between Norvell Bryant Highway and North Lopp Point.
Other work included safety improvements such as sidewalk connectivity, sidewalk repairs, curb ramp reconstruction, and pedestrian lighting installed at signalized intersections. Signing, pavement markings, and minor drainage improvements were also done throughout the project area and signalization upgrades were made at N Rock Crusher Road.