===== PAGE 1 ===== ## SR 44 (Gulf to Lake Hwy) Repaving from Norvell Bryant Hwy to west of N Lopp Point 432582-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
Limitsfrom Norvell\nBryant Hwy to\nwest of N. Lopp\nPoint
Project StartOctober 14,\n2023
Length2.4 miles
CityCrystal River\nLecanto
CountyCitrus
RoadGulf To Lake\nHighway (Citrus)\nSR 44
Construction Cost$5.9 million
Estimated CompletionSeptember 16,\n2024
ContractorSuperior Asphalt, Inc.
Contact Information
Project Information
John McShaffrey\n813-975-6930\nroadwork@dot.state.fl.us
Media Contact
Kayla Mejia\n813-975-6060\nKayla.Mejia@dot.state.fl.us
44
Image
Map data ©2024 Google ## About ## This project was accepted from the contractor as completed on October 17, 2024 This project milled and resurfaced SR 44 (Gulf to Lake Highway) between Norvell Bryant Highway and North Lopp Point. Other work included safety improvements such as sidewalk connectivity, sidewalk repairs, curb ramp reconstruction, and pedestrian lighting installed at signalized intersections. Signing, pavement markings, and minor drainage improvements were also done throughout the project area and signalization upgrades were made at N Rock Crusher Road.