===== PAGE 1 =====
## SR 688 (Ulmerton Road) & SR 686 (Roosevelt Boulevard) Sidewalk Improvements 450969-2-52-01
| Project Details |
| Work Type | Sidewalk Improvements |
| Phase | Design |
| Limits | SR 688 (Ulmerton Road) from Roosevelt Boulevard off-ramp to Carillon Parkway; SR 686 (Roosevelt Boulevard) from 28th Street N to 16th Street N; SR 686 (Roosevelt Boulevard) from Lake Carillon Drive to Ulmerton Road |
| Length | 1.99 miles |
| City | Clearwater St. Petersburg |
| County | Pinellas |
| Road | Roosevelt Boulevard SR 686 SR 688 Ulmerton Road |
| Contact Information |
| Design Manager |
| Stephanie Wolchok | 813-975-6244 |
| Stephanie.Wolchok@dot.state.fl.us |
| Media Contact |
| Kayla Mejia | 813-975-6060 |
| Kayla.Mejia@dot.state.fl.us |
Google 41 OCC Road House & Museum
Map data ©2026
## About
The purpose of this project is to construct 6-foot concrete sidewalks at the following locations in Pinellas County:
• Along the south side of SR 688 (Ulmerton Road) from Roosevelt Boulevard off-ramp to Carillon Parkway
• Along the west side of SR 686 (Roosevelt Boulevard) from 28th Street N to 16th Street N
• Along the east side of SR 686 (Roosevelt Boulevard) from Lake Carillon Drive to Ulmerton Road
Construction is anticipated to begin late 2027.