Alt US 19 (Seminole Boulevard/Missouri Avenue) Intersection Improvements at SR 686 (E Bay Drive/ W Bay Drive) 451096-1-32-01

Project Details
Work TypeIntersectionImprovements
PhaseDesign
LimitsAlt US 19(SeminoleBoulevard/MissouriAvenue) at SR 686(E Bay Drive/ W Bay Drive)
Length0.045 miles
CityLargo
CountyPinellas
RoadAlt US 19Missouri AvenueSeminoleBoulevardSR 595

Contact Information

Design Manager

Alex Carlson

813-975-3668

Alex.Carlson@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us

About

This project will modify turn radius on all four corners to shorten pedestrian crossing distances at this section of Alternate US 19 (Seminole Boulevard/Missouri Avenue). The crosswalks will be modified, pedestrian signals will be upgraded, and ADA improvements will be completed.

Construction is expected to begin winter of 2027.