U.S. 92 (Baker Street) Resurfacing from N Gordon Street to Thonotosassa Road 446025-1-52-01

Project Details
Work TypeResurfacing
PhaseDesign
LimitsU.S. 92 (Baker Street) from N Gordon Street to Thonotosassa Road
Length1.9 miles
CityPlant City
CountyHillsborough
RoadBaker Street SR 600 US 92

About

The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of U.S. 92 (Baker Street) in Plant City.

Contact Information

Design Manager

  • Jason Jordan
  • 975-6169
  • Jason.Jordan@dot.state.fl.us

Media Contact

Kayla Mejia

813-975-6060

Kayla.Mejia@dot.state.fl.us

In addition to resurfacing, this project also includes ADA upgrades, adding or replacing signage, as well as adding rapid flashing beacon pedestrian crossings at N. Dort St. and N. Michigan Ave.

Other improvements include adding special emphasis crosswalks and adding or replacing signal reflectorized backplates.

Construction is currently anticipated to begin in Spring 2029.