Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv. UI as Pervious Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method

Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv. UI as Pervious Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment 36S: Roof Lot 1Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=9.24" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.42 cfs 1,424 cf
Subcatchment 37S: Roof Lot 8Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=9.24" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.42 cfs 1,424 cf
Subcatchment 38S: Roof Lot 2Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=9.24" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.42 cfs 1,424 cf
Subcatchment 40S: Roof Lot 9Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=9.24" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.42 cfs 1,424 cf
Subcatchment 42S: Roof Lot 10Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=9.24" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.42 cfs 1,424 cf
Subcatchment 44S: Roof Lot 3Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=9.24" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.42 cfs 1,424 cf
Subcatchment 48S: Roof Lot 4Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=9.24" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.42 cfs 1,424 cf
Subcatchment 51S: Roof Lot 6Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=9.24" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.42 cfs 1,424 cf
Subcatchment 55S: Roof Lot 7Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=9.24" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.42 cfs 1,424 cf
Pond 37P: Subsurface Basin Lot 1Peak Elev=92.49' Storage=0.011 af Inflow=0.42 cfs 1,424 cf Outflow=0.03 cfs 1,424 cf
Pond 38P: Subsurface Basin Lot 8Peak Elev=95.37' Storage=0.006 af Inflow=0.42 cfs 1,424 cf Outflow=0.08 cfs 1,424 cf
Pond 39P: Subsurface Basin Lot 2Peak Elev=94.42' Storage=0.007 af Inflow=0.42 cfs 1,424 cf Outflow=0.07 cfs 1,424 cf
Pond 41P: Subsurface Basin Lot 9Peak Elev=94.45' Storage=0.007 af Inflow=0.42 cfs 1,424 cf Outflow=0.07 cfs 1,424 cf
Pond 43P: Subsurface Basin Lot 10Peak Elev=93.37' Storage=0.006 af Inflow=0.42 cfs 1,424 cf Outflow=0.08 cfs 1,424 cf
Pond 46P: Subsurface Basin Lot 3Peak Elev=94.43' Storage=0.009 af Inflow=0.42 cfs 1,424 cf Outflow=0.05 cfs 1,424 cf
Pond 50P: Subsurface Basin Lot 4Peak Elev=94.43' Storage=0.009 af Inflow=0.42 cfs 1,424 cf Outflow=0.05 cfs 1,424 cf