NOAA 24-hr D 2 YR-F Rainfall=4.04" Printed 10/24/2025
Analysis - Proposed Conditions Prepared by Civil Core Consulting HydroCAD® 10.20-7a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Page 127
Pond 39P: Subsurface Basin Lot 2
Stage-Area-Storage
0 0.000 0.001 0.001 0.002 0.002 0.003 0.003 0.004 0.004 0.005 0.005 0.006 0.006 0.007 0.007 0.008 0.009 0.009 Storage (acre-feet)