Hydrograph for Subcatchment 51S: Roof Lot 6

Time (hours)Precip. (inches)Perv.Excess (inches)Imp.Excess (inches)Runoff (cfs)
0.000.000.000.000.00
2.000.100.000.010.00
4.000.210.000.080.00
6.000.340.000.180.00
8.000.520.000.340.00
10.000.800.000.600.01
12.001.940.001.710.11
14.003.240.003.010.01
16.003.520.003.280.00
18.003.700.003.460.00
20.003.830.003.590.00
22.003.940.003.710.00
24.004.040.003.810.00
26.004.040.003.810.00
28.004.040.003.810.00
30.004.040.003.810.00
32.004.040.003.810.00
34.004.040.003.810.00
36.004.040.003.810.00
38.004.040.003.810.00
40.004.040.003.810.00
42.004.040.003.810.00
44.004.040.003.810.00
46.004.040.003.810.00
48.004.040.003.810.00
50.004.040.003.810.00
52.004.040.003.810.00
54.004.040.003.810.00
56.004.040.003.810.00
58.004.040.003.810.00
60.004.040.003.810.00
62.004.040.003.810.00
64.004.040.003.810.00
66.004.040.003.810.00
68.004.040.003.810.00
70.004.040.003.810.00
72.004.040.003.810.00

Page 107