Hydrograph for Subcatchment 51S: Roof Lot 6

Time (hours)Precip. (inches)Perv.Excess (inches)Imp.Excess (inches)Runoff (cfs)
0.000.000.000.000.00
2.000.080.000.010.00
4.000.180.000.060.00
6.000.290.000.140.00
8.000.440.000.270.00
10.000.680.000.480.01
12.001.640.001.420.09
14.002.740.002.510.01
16.002.980.002.740.00
18.003.130.002.900.00
20.003.240.003.010.00
22.003.340.003.100.00
24.003.420.003.190.00
26.003.420.003.190.00
28.003.420.003.190.00
30.003.420.003.190.00
32.003.420.003.190.00
34.003.420.003.190.00
36.003.420.003.190.00
38.003.420.003.190.00
40.003.420.003.190.00
42.003.420.003.190.00
44.003.420.003.190.00
46.003.420.003.190.00
48.003.420.003.190.00
50.003.420.003.190.00
52.003.420.003.190.00
54.003.420.003.190.00
56.003.420.003.190.00
58.003.420.003.190.00
60.003.420.003.190.00
62.003.420.003.190.00
64.003.420.003.190.00
66.003.420.003.190.00
68.003.420.003.190.00
70.003.420.003.190.00
72.003.420.003.190.00

Page 24