Analysis - Proposed Conditions NOAA 24-hr D 2 YR-C Rainfall=3.42" Prepared by Civil Core Consulting Printed 10/24/2025 HydroCAD® 10.20-7a s/n 13637 © 2025 HydroCAD Software Solutions LLC Page 7
| Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points | ||
| Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv. UI as Pervious | ||
| Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method | ||
| Subcatchment 36S: Roof Lot 1 | Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=3.19" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.15 cfs 491 cf | |
|---|---|---|
| Subcatchment 37S: Roof Lot 8 | Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=3.19" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.15 cfs 491 cf | |
| Subcatchment 38S: Roof Lot 2 | Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=3.19" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.15 cfs 491 cf | |
| Subcatchment 40S: Roof Lot 9 | Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=3.19" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.15 cfs 491 cf | |
| Subcatchment 42S: Roof Lot 10 | Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=3.19" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.15 cfs 491 cf | |
| Subcatchment 44S: Roof Lot 3 | Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=3.19" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.15 cfs 491 cf | |
| Subcatchment 48S: Roof Lot 4 | Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=3.19" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.15 cfs 491 cf | |
| Subcatchment 51S: Roof Lot 6 | Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=3.19" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.15 cfs 491 cf | |
| Subcatchment 55S: Roof Lot 7 | Runoff Area=1,850 sf 100.00% Impervious Runoff Depth=3.19" Flow Length=45' Tc=0.4 min CN=0/98 Runoff=0.15 cfs 491 cf | |
| Pond 37P: Subsurface Basin Lot 1 | Peak Elev=91.36' Storage=0.002 af Inflow=0.15 cfs 491 cf Outflow=0.03 cfs 491 cf | |
| Pond 38P: Subsurface Basin Lot 8 | Peak Elev=94.21' Storage=0.001 af Inflow=0.15 cfs 491 cf Outflow=0.08 cfs 491 cf | |
| Pond 39P: Subsurface Basin Lot 2 | Peak Elev=93.25' Storage=0.001 af Inflow=0.15 cfs 491 cf Outflow=0.07 cfs 491 cf | |
| Pond 41P: Subsurface Basin Lot 9 | Peak Elev=93.26' Storage=0.001 af Inflow=0.15 cfs 491 cf Outflow=0.07 cfs 491 cf | |
| Pond 43P: Subsurface Basin Lot 10 | Peak Elev=92.21' Storage=0.001 af Inflow=0.15 cfs 491 cf Outflow=0.08 cfs 491 cf | |
| Pond 46P: Subsurface Basin Lot 3 | Peak Elev=93.30' Storage=0.001 af Inflow=0.15 cfs 491 cf Outflow=0.05 cfs 491 cf | |
| Pond 50P: Subsurface Basin Lot 4 | Peak Elev=93.30' Storage=0.001 af Inflow=0.15 cfs 491 cf Outflow=0.05 cfs 491 cf | |