Analysis - Proposed Conditions Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Table of Contents Printed 12/19/2025
315 Pond 5P: BIORETENTION BASIN 1A 321 Pond 6P: BIORENTION BASIN 2A 327 Pond 8P: INFILTRATION BASIN 3 333 Pond 10P: PERVIOUS PAVEMENT 2B 339 Pond 15P: PERVIOUS PAVEMENT 3B 345 Pond 33P: INFILTRATION BASIN 2 351 Pond 42P: BIORENTION BASIN 3A 357 Link 32L: POA1 359 Link 33L: POA 2 361 Link 34L: POA 3
100 YR-F Event
363 Node Listing
365 Subcat 2S: DA-P1 PERVIOUS
367 Subcat 3S: DA-P3 PERVIOUS
369 Subcat 4S: DA-P2 PERVIOUS
371 Subcat 6S: DA-P3 IMPERVIOUS
373 Subcat 7S: DA-P2 IMPERVIOUS
375 Subcat 8S: DA-P1 IMPERVIOUS
377 Subcat 14S: LOT 11 Roof
379 Pond 2P: Subsurface Infiltration Basin 1
386 Pond 5P: BIORETENTION BASIN 1A
392 Pond 6P: BIORETENTION BASIN 2A
398 Pond 8P: INFILTRATION BASIN 3
404 Pond 10P: PERVIOUS PAVEMENT 2B
410 Pond 15P: PERVIOUS PAVEMENT 3B
416 Pond 33P: INFILTRATION BASIN 2
422 Pond 42P: BIORETENTION BASIN 3A
428 Link 32L: POA1
430 Link 33L: POA 2
432 Link 34L: POA 3
Multi-Event Tables
434 Subcat 2S: DA-P1 PERVIOUS
438 Subcat 7S: DA-P2 IMPERVIOUS
439 Subcat 8S: DA-P1 IMPERVIOUS
435 Subcat 3S: DA-P3 PERVIOUS
440 Subcat 14S: LOT 11 Roof
436 Subcat 4S: DA-P2 PERVIOUS 437 Subcat 6S: DA-P3 IMPERVIOUS
437 Subcat 6S: DA-P3 IMPERVIOUS
441 Pond 2P: Subsurface Infiltration Basin 1
442 Pond 5P: BIORETENTION BASIN 1A
443 Pond 6P: BIORENTION BASIN 2A
444 Pond 8P: INFILTRATION BASIN 3
445 Pond 10P: PERVIOUS PAVEMENT 2B
446 Pond 15P: PERVIOUS PAVEMENT 3B
447 Pond 33P: INFILTRATION BASIN 2
448 Pond 42P: BIORENTION BASIN 3A
449 Link 32L: POA1
450 Link 33L: POA 2
451 Link 34L: POA 3
451 Link 34L: POA 3