Analysis - Proposed Conditions Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Table of Contents Printed 12/19/2025
TABLE OF CONTENTS
Project Reports
1 Routing Diagram 2 Project Notes 3 Rainfall Events Listing (selected events) 4 Area Listing (selected nodes) 5 Soil Listing (selected nodes) 6 Ground Covers (selected nodes) 7 Pipe Listing (selected nodes)
2 YR-C Event
8 Node Listing
10 Subcat 2S: DA-P1 PERVIOUS
12 Subcat 3S: DA-P3 PERVIOUS
14 Subcat 4S: DA-P2 PERVIOUS
16 Subcat 6S: DA-P3 IMPERVIOUS
18 Subcat 7S: DA-P2 IMPERVIOUS
20 Subcat 8S: DA-P1 IMPERVIOUS
22 Subcat 14S: LOT 11 Roof
24 Pond 2P: Subsurface Infiltration Basin 1
31 Pond 5P: BIORETENTION BASIN 1A
37 Pond 6P: BIORENTION BASIN 2A
43 Pond 8P: INFILTRATION BASIN 3
49 Pond 10P: PERVIOUS PAVEMENT 2B
55 Pond 15P: PERVIOUS PAVEMENT 3B
61 Pond 33P: INFILTRATION BASIN 2
67 Pond 42P: BIORENTION BASIN 3A
73 Link 32L: POA1
75 Link 33L: POA 2
77 Link 34L: POA 3
2 YR-F Event
79 Node Listing 81 Subcat 2S: DA-P1 PERVIOUS
87 Subcat 6S: DA-P3 IMPERVIOUS
81 Subcat 2S: DA-P1 PERVIOUS
89 Subcat 7S: DA-P2 IMPERVIOUS
83 Subcat 3S: DA-P3 PERVIOUS
91 Subcat 8S: DA-P1 IMPERVIOUS
85 Subcat 4S: DA-P2 PERVIOUS
93 Subcat 14S: LOT 11 Roof
95 Pond 2P: Subsurface Infiltration Basin 1
102 Pond 5P: BIORETENTION BASIN 1A
108 Pond 6P: BIORENTION BASIN 2A
114 Pond 8P: INFILTRATION BASIN 3
120 Pond 10P: PERVIOUS PAVEMENT 2B
126 Pond 15P: PERVIOUS PAVEMENT 3B
132 Pond 33P: INFILTRATION BASIN 2
138 Pond 42P: BIORENTION BASIN 3A
14 Link 32L: POA1
146 Link 33L: POA2
148 Link 34L: POA 3