| Analysis - Proposed Conditions | Multi-Event Tables |
|---|
| Prepared by Civil Core Consulting | Printed 12/19/2025 |
| HydroCAD\circledR 10.20-8a s/n 13637\circledC 2025 HydroCAD Software Solutions LLC | Page 444 |
Events for Pond 8P: INFILTRATION BASIN 3
| Events for Pound 8P. INFILTRATION BASIN 3 |
| Event | Inflow (cfs) | Outflow (cfs) | Discarded (cfs) | Primary (cfs) | Elevation (feet) | Storage (cubic-feet) |
|---|
| 2 YR-C | 0.15 | 0.15 | 0.15 | 0.00 | 90.76 | 6 |
|---|
| 2 YR-F | 0.27 | 0.27 | 0.27 | 0.00 | 90.76 | 13 |
|---|
| 10 YR-C | 0.67 | 0.27 | 0.27 | 0.00 | 91.01 | 294 |
|---|
| 10 YR-F | 0.94 | 0.27 | 0.27 | 0.00 | 91.23 | 548 |
|---|
| 100 YR-C | 1.59 | 0.34 | 0.27 | 0.07 | 93.06 | 2,655 |
|---|
| 100 YR-F | 2.66 | 0.47 | 0.27 | 0.20 | 94.40 | 4,201 |
|---|