Events for Pond 5P: BIORETENTION BASIN 1A

EventInflow (cfs)Primary (cfs)Elevation (feet)Storage (cubic-feet)
2 YR-C1.330.1491.882,824
2 YR-F1.580.1792.213,321
10 YR-C2.110.2392.994,482
10 YR-F2.500.2793.745,607
100 YR-C4.201.8995.107,644
100 YR-F5.504.1295.177,760