NOAA 24-hr D 100 YR-F Rainfall=11.41" Printed 12/19/2025 tions LLC Page 386
Analysis - Proposed Conditions NOAA 24 Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Summary for Pond 5P: BIORETENTION BASIN 1A
Inflow Area =70,567 sf,24.69% Impervious,Inflow Depth = 4.92" for 100 YR-F event
Inflow =5.50 cfs @12.11 hrs,Volume= 28,914 cf
Outflow =4.12 cfs @12.18 hrs,Volume= 27,407 cf, Atten= 25%, Lag= 4.0 min
Primary =4.12 cfs @12.18 hrs,Volume= 27,407 cf
Routed to Bond 2B : Subsurface Infiltration Basin 1
Routed to Pond 2P : Subsurface Infiltration Basin 1
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 95.17' @ 12.18 hrs Surf.Area= 1,500 sf Storage= 7,760 cf Plug-Flow detention time= 232.3 min calculated for 27,407 cf (95% of inflow) Center-of-Mass det. time= 201.5 min (1,013.2 - 811.7)
VolumeInvertAvail.StorageStorage Description
#190.00'8,250 cfCustom Stage Data (Prismatic)Listed below (Recalc)
Elevation (feet)Surf.Area (sq-ft)Inc.Store (cubic-feet)Cum.Store (cubic-feet)
90.001,50000
95.501,5008,2508,250
DeviceRoutingInvertOutlet Devices
#1Device 391.00'2.5" Vert. Orifice C = 0.600 Limited to weir flow at low heads
#2Device 395.00'48.0" x 48.0" Horiz. Grate C = 0.600 Limited to weir flow at low heads
#3Primary87.48'12.0" Round Culvert\n L = 28.0' RCP, groove end projecting, Ke = 0.200\nInlet / Outlet Invert= $ 87.48'/87.00' $ S = 0.0171'/' Cc = 0.900\n n = 0.012 Concrete pipe, finished, Flow Area= $ 0.79sf $
Primary OutFlow Max=4.11 cfs @ 12.18 hrs HW=95.17' TW=87.79' (Dynamic Tailwater) 3=Culvert (Passes 4.11 cfs of 12.09 cfs potential flow) 1=Orifice (Orifice Controls 0.33 cfs @ 9.71 fps) 2=Grate (Weir Controls 3.78 cfs @ 1.36 fps)
Pond 5P: BIORETENTION BASIN 1A Orifice