NOAA 24-hr D 10 YR-F Rainfall=6.34" Printed 12/19/2025 ons LLC Page 265
Analysis - Proposed Conditions NO Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions Ltd
Hydrograph for Pond 10P: PERVIOUS PAVEMENT 2B
Time (hours)Inflow (cfs)Storage (cubic-feet)Elevation (feet)Primary (cfs)
0.000.00093.800.00
2.000.012393.820.00
4.000.028393.870.01
6.000.0211893.900.02
8.000.0315193.920.02
10.000.0520693.970.04
12.000.6072894.540.13
14.000.0664794.370.11
16.000.0332994.070.07
18.000.0217993.950.03
20.000.0213893.910.02
22.000.0212493.900.02
24.000.0111393.890.01
26.000.005893.850.00
28.000.003893.830.00
30.000.002893.820.00
32.000.002293.820.00
34.000.001893.810.00
36.000.001593.810.00
38.000.001393.810.00
40.000.001293.810.00
42.000.001193.810.00
44.000.001093.810.00
46.000.00993.810.00
48.000.00893.810.00
50.000.00893.810.00
52.000.00793.810.00
54.000.00793.810.00
56.000.00693.810.00
58.000.00693.800.00
60.000.00593.800.00
62.000.00593.800.00
64.000.00593.800.00
66.000.00593.800.00
68.000.00593.800.00
70.000.00493.800.00
72.000.00493.800.00