Analysis - Proposed Conditions NOAA 24-hr D 10 YR-F Rainfall=6.34" Prepared by Civil Core Consulting Printed 12/19/2025 HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC Page 237
Summary for Pond 2P: Subsurface Infiltration Basin 1
Inflow Area = 73,567 sf, 27.76% Impervious, Inflow Depth = 1.84" for 10 YR-F event
Inflow = 0.65 cfs @ 12.09 hrs, Volume= 11,301 cf
Outflow = 0.57 cfs @ 12.13 hrs, Volume= 11,301 cf, Atten= 12%, Lag= 2.4 min
Discarded = 0.57 cfs @ 12.13 hrs, Volume= 11,301 cf
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf
Routed to Link 32L : POA1
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 87.03' @ 12.10 hrs Surf.Area= 2,475 sf Storage= 31 cf
Plug-Flow detention time= 0.3 min calculated for 11,301 cf (100% of inflow)
Center-of-Mass det. time= 0.3 min ( 1,011.5 - 1,011.2 )
VolumeInvertAvail.StorageStorage Description
#1A87.00'4,349 cf27.50'W x 90.00'L x 6.00'H Field A
#2A87.50'3,188 cf14,850 cf Overall - 3,979 cf Embedded = 10,871 cf x 40.0% Voids ADS N-12 36" x 20 Inside #1 Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf 20 Chambers in 5 Rows 24.50' Header x 7.10 sf x 2 = 347.9 cf Inside
7,536 cf Total Available Storage
Storage Group A created with Chamber Wizard
DeviceRoutingInvertOutlet Devices
#1Primary92.59'48.0" x 48.0" Horiz. Grate C = 0.600 Limited to weir flow at low heads
#2Device 188.00'12.0" Round Culvert L = 119.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 88.00' / 86.00' S = 0.0168 /' Cc= 0.900 n = 0.012 Concrete pipe, finished, Flow Area= 0.79 sf
#3Discarded87.00'10.000 in/hr Exfiltration over Surface area Phase-In= 0.01'
Discarded OutFlow Max=0.57 cfs @ 12.13 hrs HW=87.02' (Free Discharge)
3=Exfiltration (Exfiltration Controls 0.57 cfs)
Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=87.00' TW=0.00' (Dynamic Tailwater)
1=Grate ( Controls 0.00 cfs)
2=Culvert ( Controls 0.00 cfs)
Pond 2P: Subsurface Infiltration Basin 1