NOAA 24-hr D 2 YR-C Rainfall=3.42" Printed 12/19/2025
Analysis - Proposed Conditions NO Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Hydrograph for Pond 42P: BIORENTION BASIN 3A
Time (hours)Inflow (cfs)Storage (cubic-feet)Elevation (feet)Primary (cfs)
0.000.00093.300.00
2.000.00093.300.00
4.000.00093.300.00
6.000.00093.300.00
8.000.00093.300.00
10.000.00093.300.00
12.000.00093.300.00
14.000.00093.300.00
16.000.00093.300.00
18.000.00093.300.00
20.000.00193.320.00
22.000.00693.360.00
24.000.001293.420.00
26.000.001393.420.00
28.000.001393.420.00
30.000.001393.420.00
32.000.001393.420.00
34.000.001393.420.00
36.000.001393.420.00
38.000.001393.420.00
40.000.001393.420.00
42.000.001393.420.00
44.000.001393.420.00
46.000.001393.420.00
48.000.001393.420.00
50.000.001393.420.00
52.000.001393.420.00
54.000.001393.420.00
56.000.001393.420.00
58.000.001393.420.00
60.000.001393.420.00
62.000.001393.420.00
64.000.001393.420.00
66.000.001393.420.00
68.000.001393.420.00
70.000.001393.420.00
72.000.001393.420.00
Page 70