Summary for Pond 42P: BIORENTION BASIN 3A

Inflow Area = 29,621 sf, 0.00% Impervious, Inflow Depth = 0.01" for 2 YR-C event Inflow = 0.00 cfs @ 24.02 hrs, Volume= 13 cf Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routed to Pond 8P : INFILTRATION BASIN 3 Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 93.42' @ 25.28 hrs Surf.Area= 137 sf Storage= 13 cf Plug-Flow detention time=(not calculated: initial storage exceeds outflow) Center-of-Mass det. time=(not calculated: no outflow)

VolumeInvertAvail.StorageStorage Description
#193.30'1,041 cfCustom Stage Data (Prismatic)Listed below (Recalc)
Elevation (feet)Surf.Area (sq-ft)Inc.Store (cubic-feet)Cum.Store (cubic-feet)
93.307700
94.00417173173
95.001,3198681,041
DeviceRoutingInvertOutlet Devices
#1Device 393.80'2.5" Vert. Orifice C = 0.600Limited to weir flow at low heads
#2Device 394.50'48.0" x 48.0" Horiz. Grate C = 0.600
#3Primary90.80'12.0" Round Culvert\n L = 11.0' RCP, groove end projecting, Ke = 0.200\nInlet / Outlet Invert= $ 90.80' / 90.75' $ S = 0.0045' /' Cc = 0.900\n n = 0.012 Concrete pipe, finished, Flow Area= $ 0.79 $ sf
Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=93.30' TW=90.75' (Dynamic Tailwater) 3=Culvert (Passes 0.00 cfs of 6.42 cfs potential flow) 1=Orifice ( Controls 0.00 cfs) 2=Grate ( Controls 0.00 cfs)
Bond 42B: BIOVENTION BASIN 3AGrate Orifice