NOAA 24-hr D 2 YR-C Rainfall=3.42" Printed 12/19/2025 Page 58
Analysis - Proposed Conditions NO Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LL
Hydrograph for Pond 15P: PERVIOUS PAVEMENT 3B
Time (hours)Inflow (cfs)Storage (cubic-feet)Elevation (feet)Primary (cfs)
0.000.00093.800.00
2.000.00493.800.00
4.000.013493.830.00
6.000.016693.860.01
8.000.029593.880.01
10.000.0313393.910.02
12.000.3440194.140.08
14.000.0347594.200.09
16.000.0219193.960.04
18.000.0112093.900.02
20.000.019893.880.01
22.000.018893.870.01
24.000.018193.870.01
26.000.004693.840.00
28.000.003193.830.00
30.000.002493.820.00
32.000.001993.820.00
34.000.001693.810.00
36.000.001493.810.00
38.000.001293.810.00
40.000.001193.810.00
42.000.001093.810.00
44.000.00993.810.00
46.000.00893.810.00
48.000.00793.810.00
50.000.00793.810.00
52.000.00693.810.00
54.000.00693.810.00
56.000.00693.800.00
58.000.00593.800.00
60.000.00593.800.00
62.000.00593.800.00
64.000.00593.800.00
66.000.00493.800.00
68.000.00493.800.00
70.000.00493.800.00
72.000.00493.800.00