NOAA 24-hr D 2 YR-C Rainfall=3.42" Printed 12/19/2025 Page 52
Analysis - Proposed Conditions NO Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Hydrograph for Pond 10P: PERVIOUS PAVEMENT 2B
Time (hours)Inflow (cfs)Storage (cubic-feet)Elevation (feet)Primary (cfs)
0.000.00093.800.00
2.000.00493.800.00
4.000.013393.830.00
6.000.016593.850.01
8.000.029593.880.01
10.000.0313393.910.02
12.000.3239094.120.08
14.000.0347194.180.09
16.000.0219393.960.04
18.000.0112293.900.02
20.000.0110093.880.01
22.000.019093.870.01
24.000.018293.870.01
26.000.004893.840.00
28.000.003393.830.00
30.000.002593.820.00
32.000.002093.820.00
34.000.001793.810.00
36.000.001593.810.00
38.000.001393.810.00
40.000.001193.810.00
42.000.001093.810.00
44.000.00993.810.00
46.000.00993.810.00
48.000.00893.810.00
50.000.00793.810.00
52.000.00793.810.00
54.000.00693.810.00
56.000.00693.800.00
58.000.00693.800.00
60.000.00593.800.00
62.000.00593.800.00
64.000.00593.800.00
66.000.00593.800.00
68.000.00493.800.00
70.000.00493.800.00
72.000.00493.800.00