GIBasin BottomStorage Volume Retained up to the Lowest Outfall ElevationImpervious Area (AC)
Bioretention Basin 1A90.001,500 cu-ft0.40
Bioretention Basin 2A94.3047 cu-ft0.0
Bioretention Basin 3A93.3099 cu-ft0.0
Subsurface Infiltration Basin 187.00980 cu-ft0.40
Surface Infiltration Basin 291.651,902 cu-ft0.19
Surface Infiltration Basin 390.752,300 cu-ft0.20

Groundwater Mounding Analysis

In accordance with N.J.A.C. 7:8-5.2(h) whenever the stormwater management design includes one or more BMPs that will infiltrate stormwater into subsoil, the design engineer shall assess the hydraulic impact on the groundwater table and design the site, to avoid adverse hydraulic impacts.

A groundwater mounding analysis has been prepared for the proposed green infrastructures (GI) using the USGS Hantush spreadsheet in accordance with NJDEP BMP Manual Chapter 13. The proposed GI's have been modeled using infiltration for all storm events. Therefore, the groundwater mounding analysis has been performed for the infiltration volume generated by the future 100-year storm event as calculated by HydroCAD.

GROUNDWATER MOUNDING MODELING CRITERIA
CriteriaValueNotes
R-Recharge RateSee belowPer Geotech
Sy-Specific Yield0.15Default
Kh-Horizontal conductivity5xRCoastal Plains
hi-Initial Thickness of saturated zone34 feetPer Deep Boring Report

13 | Page