PROJECT #: CALCULATED BY: DATE:

SCOUR HOLE 1A-16

Design Parameters

W_{0} Max Width of Pipe/Culvert 12 in

Q Flow: 25-yr Storm Discharge 0.32 cfs

TW Tail water from 2 year storm 1.59 ft

Rip Rap Stone Size Calculations

q Unit Discharge = Q/W_{0} 0.32 cfs per foot

Option 1 if Scour Hole Depth, y = 1/2 D0 6 in

Apron Dimension Calculations

Minimum Bottom Width W1 = 2 W0 2.00 ft

Minimum Bottom Length L1 = 3 D0 3.00 ft

Minimum Top Width (max side slope of 3:1), 5.00 ft

Minimum Top Length (max side slope of 3:1) 6.00 ft

Median Stone d50 = (0.0125 q1.33)/TW 4 in

Apron Thickness, TH = 2 × d50 8 in

Option 2 if Scour Hole Depth, y = D0 12 in

Apron Dimension Calculations

Minimum Bottom Width W1 = 2 W0 2.00 ft

Minimum Bottom Length L1 = 3 D0 3.00 ft

Minimum Top Width (max side slope of 3:1), 8.00 ft

Minimum Top Length (max side slope of 3:1) 9.00 ft

Median Stone d50 = (0.0082 q1.33)/TW 4 in

Apron Thickness, TH = 2xd50 8 in