Groundwater Mounding-Duration of Infiltration Period
| Basin | Subsurface Infiltration Basin 1 |
|---|
| Volume (cf) | 29874 |
|---|
| Infiltration Area (sf) | 2475 |
|---|
| Recharge Rate (in/hr) | 10 |
|---|
| Duration of infiltration period, t (hr) = (Volume of runoff to be infiltrated (cf) × 12 in/ft)/(Infiltration area (sf) × Recharge rate (in/hr)) | ft |
| Duration of Infiltration Period | 14.48 |
|---|
| Groundwater Mounding-Duration of Infiltration Period |
| Basin | Infiltration Basin 2 |
|---|
| Volume (cf) | 9837 |
|---|
| Infiltration Area (sf) | 520 |
|---|
| Recharge Rate (in/hr) | 4.95 |
|---|
| Duration of infiltration period, t (hr) = (Volume of runoff to be infiltrated (cf) × 12 in/ft)/(Infiltration area (sf) × Recharge rate (in/hr)) |
| Duration of Infiltration Period | 45.86 |
|---|
| Basin | Infiltration Basin 3 |
|---|
| Volume (cf) | 12583 |
|---|
| Infiltration Area (sf) | 1150 |
|---|
| Recharge Rate (in/hr) | 10 |
|---|
| Duration of infiltration period, t (hr) = (Volume of runoff to be infiltrated (cf) × 12 in/ft)/(Infiltration area (sf) × Recharge rate (in/hr)) |
13.13