NJ DEP 2-hr NJDEP WQ Rainfall=1.25" Printed 12/19/2025
Analysis - Proposed Conditions NJ D Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions L
Hydrograph for Pond 36P: BIORETENTION BASIN 1A
Time (hours)Inflow (cfs)Storage (cubic-feet)Elevation (feet)Primary (cfs)
0.000.00090.000.00
2.000.041,49391.000.00
4.000.001,50291.000.00
6.000.001,50291.000.00
8.000.001,50291.000.00
10.000.001,50291.000.00
12.000.001,50291.000.00
14.000.001,50291.000.00
16.000.001,50291.000.00
18.000.001,50291.000.00
20.000.001,50291.000.00
22.000.001,50291.000.00
24.000.001,50291.000.00
26.000.001,50291.000.00
28.000.001,50291.000.00
30.000.001,50291.000.00
32.000.001,50291.000.00
34.000.001,50291.000.00
36.000.001,50291.000.00
38.000.001,50291.000.00
40.000.001,50291.000.00
42.000.001,50291.000.00
44.000.001,50291.000.00
46.000.001,50291.000.00
48.000.001,50291.000.00
50.000.001,50291.000.00
52.000.001,50291.000.00
54.000.001,50291.000.00
56.000.001,50291.000.00
58.000.001,50291.000.00
60.000.001,50291.000.00
62.000.001,50291.000.00
64.000.001,50191.000.00
66.000.001,50191.000.00
68.000.001,50191.000.00
70.000.001,50191.000.00
72.000.001,50191.000.00
Page 42