SUBSURFACE INFILTRATION BASIN GREEN INFRASTRUCTURE REQUIREMENTS
GITributary Drainage Area (Max 2.5 Ac)Basin Bottom Elev. (ft)SHWT Elev. (ft)Separation from SHWT (Min. 2 ft)Tested Permeability (Min. 1 in/hr)Basin Storage Vol. (af) (Min. WQS)Test Pits
11.68987.081.355.65200.17313 & 14
Lot 10.04291.088.03.04.90.0143 & 18
Lot 20.04293.090.03.015.70.00919 & 20
Lot 30.04293.088.54.58.10.01220 & 24
Lot 40.04293.088.54.58.10.01221 & 24
Lot 60.04293.085.577.4316.90.0098 & 9
Lot 70.04294.089.374.6320.00.00910 & 5
Lot 80.04294.089.374.6320.00.00910 & 11
Lot 90.04293.083.849.1616.00.0092 & 16
Lot 100.04292.085.516.4920.00.00916 & 17

UNDERDRAINED BIORETENTION BASIN GREEN INFRASTRUCTURE REQUIREMENTS

GITotal Tributary Drainage Area (Max 2.5 Ac)Basin Bottom Elev. (ft)Lowest Outlet Elev. (ft)WQS Elev. (ft)SHWT Elev. (ft)Separation from SHWT (min. 3.75')Test Pits
1A1.6290.091.0091.0085.514.4917 & 13A
2A0.4394.3094.8094.3086.797.5121 & 22
3A0.6893.3092.3091.885.577.738 & 9

UNDERDRAINED POROUS PAVEMENT GREEN INFRASTRUCTURE REQUIREMENTS

GIPorous Pvmt Area (SF)Tributary Drainage Area (ac)Ratio (Max 3:1)Stone Bed Bottom Elev. (ft)Pavmt. Min. Top ElevationSHWT Elev. (ft)Separation from SHWT (Min. 1.25 ft)Stone Bed Vol (Min. WQS vol.) (ft3)Test Pits
2B3,0750.192.69:193.8094.8087.287.521,538.0023 & 6A
3B2,9630.202.94:193.8094.8087.287.521,482.0023 & 9

12 | Page