NJ DEP 2-hr NJDEP WQ Rainfall=1.25" Printed 12/19/2025
Analysis - Proposed Conditions NJ DEF Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Page 37
Stage-Discharge for Pond 14P: PERVIOUS PAVEMENT 3B
Elevation (feet)Primary (cfs)Elevation (feet)Primary (cfs)Elevation (feet)Primary (cfs)
93.800.0094.320.1194.840.58
93.810.0094.330.1194.850.74
93.820.0094.340.1194.860.93
93.830.0094.350.1194.871.13
93.840.0094.360.1194.881.35
93.850.0094.370.1194.891.58
93.860.0194.380.1194.901.82
93.870.0194.390.1194.912.07
93.880.0194.400.1294.922.34
93.890.0194.410.1294.932.62
93.900.0294.420.1294.942.91
93.910.0294.430.1294.953.21
93.920.0294.440.1294.963.52
93.930.0394.450.1294.973.84
93.940.0394.460.1294.984.17
93.950.0394.470.1294.994.50
93.960.0494.480.1295.004.85
93.970.0494.490.1395.015.21
93.980.0594.500.1395.025.57
93.990.0594.510.1395.035.95
94.000.0594.520.1395.046.33
94.010.0594.530.1395.056.72
94.020.0694.540.1395.067.11
94.030.0694.550.1395.077.46
94.040.0694.560.1395.087.47
94.050.0694.570.1395.097.48
94.060.0694.580.1395.107.50
94.070.0794.590.1495.117.51
94.080.0794.600.1495.127.52
94.090.0794.610.1495.137.53
94.100.0794.620.1495.147.54
94.110.0794.630.1495.157.55
94.120.0894.640.1495.167.56
94.130.0894.650.1495.177.57
94.140.0894.660.1495.187.58
94.150.0894.670.1495.197.60
94.160.0894.680.1495.207.61
94.170.0894.690.1595.217.62
94.180.0994.700.1595.227.63
94.190.0994.710.1595.237.64
94.200.0994.720.1595.247.65
94.210.0994.730.1595.257.66
94.220.0994.740.1595.267.67
94.230.0994.750.1595.277.68
94.240.1094.760.1595.287.69
94.250.1094.770.1595.297.70
94.260.1094.780.1595.307.72
94.270.1094.790.15
94.280.1094.800.16
94.290.1094.810.21
94.300.1094.820.31
94.310.1094.830.43