NJ DEP 2-hr NJDEP WQ Rainfall=1.25" Printed 12/19/2025
Analysis - Proposed Conditions NJ D Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions L
Page 30
Hydrograph for Pond 13P: BIORENTION BASIN 3A
Time (hours)Inflow (cfs)Elevation (feet)Primary (cfs)
0.000.0093.300.00
1.000.0093.300.00
2.000.0093.300.00
3.000.0093.300.00
4.000.0093.300.00
5.000.0093.300.00
6.000.0093.300.00
7.000.0093.300.00
8.000.0093.300.00
9.000.0093.300.00
10.000.0093.300.00
11.000.0093.300.00
12.000.0093.300.00
13.000.0093.300.00
14.000.0093.300.00
15.000.0093.300.00
16.000.0093.300.00
17.000.0093.300.00
18.000.0093.300.00
19.000.0093.300.00
20.000.0093.300.00
21.000.0093.300.00
22.000.0093.300.00
23.000.0093.300.00
24.000.0093.300.00
25.000.0093.300.00
26.000.0093.300.00
27.000.0093.300.00
28.000.0093.300.00
29.000.0093.300.00
30.000.0093.300.00
31.000.0093.300.00
32.000.0093.300.00
33.000.0093.300.00
34.000.0093.300.00
35.000.0093.300.00
36.000.0093.300.00
37.000.0093.300.00
38.000.0093.300.00
39.000.0093.300.00
40.000.0093.300.00
41.000.0093.300.00
42.000.0093.300.00
43.000.0093.300.00
44.000.0093.300.00
45.000.0093.300.00
46.000.0093.300.00
47.000.0093.300.00
48.000.0093.300.00
49.000.0093.300.00
50.000.0093.300.00
51.000.0093.300.00
Time (hours)Inflow (cfs)Elevation (feet)Primary (cfs)
52.000.0093.300.00
53.000.0093.300.00
54.000.0093.300.00
55.000.0093.300.00
56.000.0093.300.00
57.000.0093.300.00
58.000.0093.300.00
59.000.0093.300.00
60.000.0093.300.00
61.000.0093.300.00
62.000.0093.300.00
63.000.0093.300.00
64.000.0093.300.00
65.000.0093.300.00
66.000.0093.300.00
67.000.0093.300.00
68.000.0093.300.00
69.000.0093.300.00
70.000.0093.300.00
71.000.0093.300.00
72.000.0093.300.00