Analysis - Failure Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Table of Contents Printed 12/19/2025
117 Subcat 17S: Typ. Roof 119 Subcat 18S: Typ. Roof 121 Subcat 35S: Typ. Roof 123 Subcat 36S: Typ. Roof 125 Subcat 37S: Typ. Roof 127 Subcat 38S: Typ. Roof 129 Subcat 39S: Typ. Roof 131 Pond 2P: Subusrface Infiltration Basin 1 138 Pond 3P: PERVIOUS PAVEMENT 2B 144 Pond 4P: PERVIOUS PAVEMENT 3B 150 Pond 5P: BIORETENTION BASIN 1A 156 Pond 7P: BIORENTION BASIN 2A 162 Pond 8P: INFILTRATION BASIN 3 168 Pond 33P: INFILTRATION BASIN 2 174 Pond 42P: BIORENTION BASIN 3A 180 Link 32L: POA1 182 Link 33L: POA 2 184 Link 34L: POA 3
Multi-Event Tables
186 Subcat 2S: DA-P1 PERVIOUS 187 Subcat 3S: DA-P3 PERVIOUS 188 Subcat 4S: DA-P2 PERVIOUS 189 Subcat 5S: Typ. Roof 190 Subcat 6S: DA-P3 IMPERVIOUS 191 Subcat 7S: DA-P2 IMPERVIOUS 192 Subcat 8S: DA-P1 IMPERVIOUS 193 Subcat 14S: LOT 11 Roof 194 Subcat 16S: Typ. Roof 195 Subcat 17S: Typ. Roof 196 Subcat 18S: Typ. Roof 197 Subcat 35S: Typ. Roof 198 Subcat 36S: Typ. Roof 199 Subcat 37S: Typ. Roof 200 Subcat 38S: Typ. Roof 201 Subcat 39S: Typ. Roof 202 Pond 2P: Subsurface Infiltration Basin 1 203 Pond 3P: PERVIOUS PAVEMENT 2B 204 Pond 4P: PERVIOUS PAVEMENT 3B 205 Pond 5P: BIORETENTION BASIN 1A 206 Pond 7P: BIORETENTION BASIN 2A 207 Pond 8P: INFILTRATION BASIN 3 208 Pond 33P: INFILTRATION BASIN 2 209 Pond 42P: BIORETENTION BASIN 3A 210 Link 32L: POA1 211 Link 33L: POA 2 212 Link 34L: POA 3