| Analysis - Failure | Multi-Event Tables |
|---|---|
| Prepared by Civil Core Consulting | Printed 12/19/2025 |
| HydroCAD\textregistered 10.20-8a s/n 13637\circledR 2025 HydroCAD Software Solutions LLC | Page 212 |
| Events for Link 34L: POA 3 | ||||
| Event | Inflow (cfs) | Primary (cfs) | Elevation (feet) | |
|---|---|---|---|---|
| 2 YR-C | 0.14 | 0.14 | 0.00 | |
| 10 YR-C | 0.19 | 0.19 | 0.00 | |