Events for Pond 5P: BIORETENTION BASIN 1A
Event
Inflow (cfs)
Primary (cfs)
Elevation (feet)
Storage (cubic-feet)
2 YR-C
1.93
0.21
93.29
4,929
10 YR-C
3.06
0.29
94.67
7,004