Stormwater Management Report South Hope Chapel Rd. Subdivision Project #23184

Groundwater Recharge

In accordance with N.J.A.C. 7:8-5.4(b), groundwater recharge can be met by infiltrating the increase in runoff from the 2-year storm event. The proposed GI infiltration basins will fully infiltrate the increased runoff from a 2-year storm event. Therefore, the requirement is met.

Green Infrastructure

In accordance with N.J.A.C. 7:8-5.3 groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards must be met using green infrastructure (GI). Green infrastructure is defined as a stormwater management measure that manages stormwater close to its source by either treating stormwater runoff through infiltration into subsoil, treating stormwater runoff through filtration by vegetation or soil; or storing stormwater runoff for reuse. The proposed stormwater management design complies with the NJDEP criteria for Small Scale Green Infrastructure as demonstrated below

INFILTRATION BASIN GREEN INFRASTRUCTURE REQUIREMENTS

GITotal Tributary Drainage Area (Max 2.5 Ac)Basin Bottom Elev. (ft)Lowest Orifice Elev. (ft)SHWT Elev. (ft)Separation from SHWT (Min. 2 ft)Tested Permeability (Min. 1 in/hr)Test Pits
20.6291.6593.6586.794.869.922 & 6A
30.8890.7592.7585.575.1820 (Soil Replacement)7 & 8

11 | Page