Analysis - Failure NOAA 24-hr D 2 YR-C Rainfall=3.42" Prepared by Civil Core Consulting Printed 12/19/2025 HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC Page 52
Hydrograph for Pond 3P: PERVIOUS PAVEMENT 2B
Time (hours)Inflow (cfs)Storage (cubic-feet)Elevation (feet)Primary (cfs)
0.000.00093.800.00
2.000.00493.800.00
4.000.013393.830.00
6.000.016593.850.01
8.000.029593.880.01
10.000.0313393.910.02
12.000.3239094.120.08
14.000.0359594.280.06
16.000.0236894.100.05
18.000.0118793.950.03
20.000.0111193.890.01
22.000.019293.870.01
24.000.018393.870.01
26.000.004893.840.00
28.000.003393.830.00
30.000.002593.820.00
32.000.002093.820.00
34.000.001793.810.00
36.000.001593.810.00
38.000.001393.810.00
40.000.001193.810.00
42.000.001093.810.00
44.000.00993.810.00
46.000.00993.810.00
48.000.00893.810.00
50.000.00793.810.00
52.000.00793.810.00
54.000.00693.810.00
56.000.00693.800.00
58.000.00693.800.00
60.000.00593.800.00
62.000.00593.800.00
64.000.00593.800.00
66.000.00593.800.00
68.000.00493.800.00
70.000.00493.800.00
72.000.00493.800.00