SR 674 Resurfacing from east of CR 579 to Katie Stanaland Drive 451995-1-52-01
| Project Details |
| Work Type | Resurfacing |
|---|
| Phase | Design |
|---|
| Limits | from CR 579 to Katie Stanaland Dr |
|---|
| Length | 2 miles |
|---|
| City | Lithia |
|---|
| County | Hillsborough |
|---|
| Road | SR 674 |
|---|
Contact Information
Design Manager
Lauren Blakeley
813-975-3669
Lauren.Blakeley@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of State Road 674 in Hillsborough County.
In addition to resurfacing, the project also includes minor guardrail replacements on the bridges along this section.
Construction activities are anticipated to begin in Spring 2028.