Interstate Lighting Upgrades along I-75 and I-4 in Hillsborough County 437789-1-52-01

Project Details
Work TypeInterstate Lighting upgrades
PhaseDesign
Limitsalong I-75 and I-4 in Hillsborough County
CityBrandon Gibsonton Plant City Riverview Tampa
CountyHillsborough
RoadI-4 I-75

Contact Information

Contact Information

Design Manager

Digvijay Patil

813-975-6176

Digvijay.Patil@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us

About

This project will upgrade the highway lighting to LED at the following locations;

  • I-75 at Gibsonton Drive
  • I-75 at US 301
  • 1-75 between SR 676 (Causeway Blvd) and SR 618 (Selmon Expressway)
  • I-4 at Park Road

The project is currently in design.

Construction activities are anticipated to begin in 2029.