===== PAGE 1 =====
# SR 590 (Drew Street) Repaving from Osceola Avenue to US 19 445681-1-52-01
| Project Details |
| Work Type | Repaving |
| Phase | Design |
| Limits | from Osceola
Avenue to US 19 |
| Length | 4.7 miles |
| City | Clearwater |
| County | Pinellas |
| Road | Drew Street
SR 590 |
| Contact Information |
| Design Manager |
| Kevin Lee |
| (813) 975-6426 |
| Kevin.Lee@dot.state.fl.us |
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
Map data ©2022 INEGI
## About
As part of the improvement project on SR 590/ Drew Street from Osceola Avenue to US19, FDOT is proposing the following:
Road resurfacing, upgrading ADA features, and improving lighting.
• Realigning Cleveland Street and Missouri Avenue by installing a new raised median to separate turning movements and to reduce crashes.
• New raised median along Drew Street from N. Missouri Avenue to the signalized intersection to reduce conflicts and improve safety.
- Lane reduction from four lanes to two lanes from Osceola Avenue to Myrtle Avenue with a separated bike lane.
Widening between Missouri Avenue and Betty Lane to improve safety and access.
• Closing the median opening at Cirus Avenue and extend the left-turn lane at Hercules Avenue to minimize turning conflicts and improve traffic flow and roadway safety.
• New signalized intersection with pedestrian crossings at Drew Street and N. Lake Drive.
• New controlled midblock crossing for pedestrians just east of Anna Avenue.