| Project Details |
| Work Type | Resurfacing |
|---|
| Phase | Completed |
|---|
| Limits | from 49th Street to SR 580 (Main Street) |
|---|
| Length | 11.48 miles |
|---|
| City | Clearwater Largo Pinellas Park |
|---|
| County | Pinellas |
|---|
| Road | SR 55 US 19 |
|---|
| Construction Cost | $4.7 million |
|---|
| Estimated Completion | Summer 2026 |
|---|
| Contractor | Preferred Materials, Inc. |
|---|
As of August 31, 2026, all construction activities associated with this project have been completed.
To improve pavement durability and provide a better driving surface the FDOT is repaving US 19 from 49th Street to SR 580 (Main Street) in Pinellas County.
Construction activities are expected to complete in summer of 2026.
Please click on the following link to learn more about staying safe in work zones: Work Zone Safety It's Everyone's Job
Contact Information
Project Information
Maddie Griffin 727-575-8334
Maddie.Griffin@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla Mejia@dot state fl us