| Project Details |
| Work Type | IntersectionImprovement |
|---|
| Phase | Design |
|---|
| Limits | At the intersection of CR 52/Meridian Avenue/21st Street/Suwanee Way/St. Joe Road |
|---|
| Length | 0.162 miles |
|---|
| City | Dade City |
|---|
| County | Pasco |
|---|
| Road | CR 52Meridian Avenue |
|---|
Contact Information
Design Manager
Charlie Xie, P.E.
813-975-6287
Charlie.Xie@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
This project will replace the existing T-intersection at CR 52/Meridian Avenue/21st Street with a four-legged signalized intersection at CR 52/Meridian Avenue/21st Street/Suwanee Way/St. Joe Road in Pasco County.
The project is currently being designed. Construction is anticipated to begin in 2027.