| Project Details | |
| Work Type | Widening |
|---|---|
| Phase | Design |
| Limits | From north of 54th Avenue Sto l-375 |
| Length | 4.6 miles |
| City | St. Petersburg |
| County | Pinellas |
| Road | I-275 |
Contact Information
Design Manager
Helena Ly 813-975-3690
Helena.Ly@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
This project will widen I-275 between 54th Avenue S. and I-375 to provide lane continuity and operational improvements. The roadway and bridges will be widened, and noise barriers will be built. A new entrance ramp at 31st Street will also be built as part of this project
This project is currently in the design phase. It is not currently funded for construction.