===== PAGE 1 =====
US 98 (SR 50A/E Jefferson Street) Resurfacing from west of Cortez Boulevard to Ponce De Leon Boulevard 451056-1-52-01
| Project Details |
| Work Type | Milling and Resurfacing |
| Phase | Design |
| Limits | US 98 (SR 50A/E)
Jefferson Street)
from west of
Cortez Blvd to
Ponce De Leon
Blvd |
| Length | 2.4 miles |
| City | Brooksville |
| County | Hernando |
| Road | Jefferson Street
SR 50A
US 98 |
| Contact Information |
| Design Manager |
| Helena Ly | 813-975-3690 |
| Helena.Ly@dot.state.fl.us |
| Media Contact |
| Kayla Mejia | 813-975-6060 |
| Kayla.Mejia@dot.state.fl.us |
1885 Brooksville Train Depot
Map data ©2025 Google
## About
The purpose of this project is to rehabilitate the existing pavement through milling and resurfacing along this section of US 98 in Hernando County.
In addition to resurfacing, the project also includes repairing existing sidewalks, ADA facility upgrades, minor drainage improvements, lighting improvements, upgrading signing and pavement markings, and signalization improvements.
Construction is currently anticipated to begin in Summer 2027.