| Project Details | |
| Work Type | IntersectionImprovements |
|---|---|
| Phase | Design |
| Limits | US 92 (Dale Mabry Highway)at Steinbrenner Drive |
| Length | 0.10 miles |
| City | Tampa |
| County | Hillsborough |
| Road | Dale Mabry HighwaySR 600US 92 |
This project includes a new traffic signal and pedestrian crosswalks at the intersection of US 92 (Dale Mabry Highway) and Steinbrenner Drive.
Construction activities are expected to begin 2027.
Contact Information
Design Manager Eyra Cash 813-975-6164 Eyra.Cash@dot.state.fl.us
Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us