## Alt US 19 (Palm Harbor Blvd) Roundabout at Florida Avenue 437636-1-52-01
| Project Details |
| Work Type | Roundabout |
| Phase | Completed |
| Limits | Alt US 19 at Florida Avenue |
| Project Start | August 4, 2022 |
| City | Palm Harbor |
| County | Pinellas |
| Road | Alt US 19 |
| Construction Cost | $2.5 million |
| Estimated Completion | Fall 2023 |
| Contractor | Cone and Graham, Inc. |
| Contact Information |
| Project Information |
| Maddie Pfingsten |
| 727-575-8334 |
| roadwork@dot.state.fl.us |
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
Map data ©2023
## About
As of September 15, 2023, all construction activities associated with this project have been completed.
This project is constructing a roundabout at the intersection of Alt. US 19 (Palm Harbor Boulevard) and Florida Avenue in Palm Harbor. Construction activities also include improving drainage, road resurfacing, new sidewalks, and modifying the existing shared use path to allow for the construction of the roundabout.
The new single-lane modern roundabout is enhancing the safety and operation of the intersection and was designed and constructed to accommodate heavy truck activity and vehicles hauling tractors. Previously, the intersection was controlled with stop signs on Florida Avenue.
On June 21, 2023, the roundabout was put into its final configuration with flowing through all portions. The truck apron is under construction to accommodate larger vehicles. This project is anticipated to be complete in the fall of 2023.