Tampa Bay Florida Department of Transportation
Alt US 19 (Palm Harbor Blvd) Roundabout at Florida Avenue 437636-1-52-01
Project Details
Work TypeRoundabout
PhaseCompleted
LimitsAlt US 19 at Florida Avenue
Project StartAugust 4, 2022
CityPalm Harbor
CountyPinellas
RoadAlt US 19
Construction Cost$2.5 million
Estimated CompletionFall 2023
ContractorCone and Graham, Inc.
About
As of September 15, 2023, all construction activities associated with this project have been completed.
This project is constructing a roundabout at the intersection of Alt. US 19 (Palm Harbor Boulevard) and Florida Avenue in Palm Harbor. Construction activities also include improving drainage, road resurfacing, new sidewalks, and modifying the existing shared use path to allow for the construction of the roundabout.
Contact Information
Project Information
Maddie Pfingsten
727-575-8334
roadwork@dot.state.fl.us
The new single-lane modern roundabout is enhancing the safety and operation of the intersection and was designed and constructed to accommodate heavy truck activity and vehicles hauling tractors. Previously, the intersection was controlled with stop signs on Florida Avenue.
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
On June 21, 2023, the roundabout was put into its final configuration with flowing through all portions. The truck apron is under construction to accommodate larger vehicles. This project is anticipated to be complete in the fall of 2023.