9th Street South (Dr. Martin Luther King Jr. St.) Bridge Replacement from 6th Ave. South to 7th Ave. South 430501-1-52-01

Project Details
Work TypeBridge Replacement
PhaseCompleted
LimitsFrom 6th Avenue South to 7th Avenue South
Project StartApril 2021
CitySt. Petersburg
CountyPinellas
Construction Cost$6 million
Estimated CompletionAugust 2025
ContractorAmerican Empire Builders, Inc.

About

As of August 28, 2025, all construction activities associated with this project have been completed.

Contact Information

Project Information

Bryce Johns 727-575-8334

Bryce.Johns@dot.state.fl.us

This project replaced the existing bridge on 9th Street South (Dr. Martin Luther King Jr. Street South) between 6th Avenue South and 7th Avenue South in St. Petersburg.

The new bridge has three 11' wide lanes with 8' shoulders and 10' wide sidewalks on each side of the bridge. The 42" sanitary sewer line, 24" and 8" water lines were also replaced, as well as a new drainage system and a new street lighting system. Also, the pylons from the original bridge were reinstalled on the new bridge.

This project is part of the FDOT's Off System Bridge Replacement program.

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us