===== PAGE 1 =====
# SR 582 (Fowler Avenue) Intersection Improvements (Multiple Locations) 447696-1-52-01
| Project Details |
| Work Type | Intersection Improvements |
| Phase | Completed |
| Limits | 15th St, 22nd St, University Collection, 30th St/Bruce B. Downs and 56th St |
| Project Start | July 12, 2021 |
| City | Tampa Temple Terrace |
| County | Hillsborough |
| Road | Fowler Avenue SR 582 |
| Construction Cost | $2.1 million |
| Estimated Completion | Summer 2022 |
| Contractor | Ajax Paving Industries of Florida, LLC |
| Contact Information |
| Project Information |
| Hamid Jafarian | 813-612-3200 |
| Hamid.Jafarian@dot.state.fl.us |
| Media Contact |
| Kayla Mejia | 813-975-6060 |
| Kayla.Mejia@dot.state.fl.us |
## About
As of Friday, June 17, 2022, all construction activities associated with this project have been completed.
This design-build improvement project upgraded multiple intersections along Fowler Avenue at 15th Street, 22nd Street, University Collection, 30th Street/Bruce B. Downs Boulevard and 56th Street in Tampa and Temple Terrace.
Upgrades included:
modified curbs, pedestrian islands, and medians
• installed new pedestrian signals, ramps, and intersection lighting
• added truck aprons (see posted images)
What are truck aprons and why are they colored red? Truck aprons slow down vehicles before turning onto a roadway and provide a safer environment for pedestrians and bicyclists. They are designed to allow the trailer of commercial vehicles to drive over the apron when making a right turn at an intersection. Truck aprons are colored red to provide enhanced visibility.
Construction is estimated to finish summer of 2022.