Tampa Bay Florida Department of Transportation
SR 582 (Fowler Avenue) Intersection Improvements (Multiple Locations) 447696-1-52-01
Project Details
Work TypeIntersection Improvements
PhaseCompleted
Limits15th St, 22nd St, University Collection, 30th St/Bruce B. Downs and 56th St
Project StartJuly 12, 2021
CityTampa Temple Terrace
CountyHillsborough
RoadFowler Avenue SR 582
Construction Cost$2.1 million
Estimated CompletionSummer 2022
ContractorAjax Paving Industries of Florida, LLC
About
As of Friday, June 17, 2022, all construction activities associated with this project have been completed.
This design-build improvement project upgraded multiple intersections along Fowler Avenue at 15th Street, 22nd Street, University Collection, 30th Street/Bruce B. Downs Boulevard and 56th Street in Tampa and Temple Terrace.
Contact Information
Project Information
Hamid Jafarian 813-612-3200
Hamid.Jafarian@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
Upgrades included:
modified curbs, pedestrian islands, and medians
installed new pedestrian signals, ramps, and intersection lighting
added truck aprons (see posted images)
What are truck aprons and why are they colored red? Truck aprons slow down vehicles before turning onto a roadway and provide a safer environment for pedestrians and bicyclists. They are designed to allow the trailer of commercial vehicles to drive over the apron when making a right turn at an intersection. Truck aprons are colored red to provide enhanced visibility.
Construction is estimated to finish summer of 2022.