Tampa Bay Florida Department of Transportation
US 41 (SR 45) Widening from north of SR 52 to south of CR 576 454840-1-52-01
Project Details
Work TypeWidening
PhaseDesign
LimitsUS 41 (SR 45) from north of SR 52 to south of CR 576
Length9.44 miles
CountyHernando Pasco
RoadSR 45 US 41
Contact Information
Design Manager
Dinyar Sharifabad
813-975-6172
Dinyar.Sharifabad@dot.state.fl.us
About
The purpose of this project is to reconstruct US 41 (SR 45) from two-lanes to a four-lane divided highway from north of SR 52 to south of CR 576. This project also includes signing and pavement markings, signals, lighting, bridge design, and right of way acquisition.
Construction is not funded at this time.
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us