US 92 (Hillsborough Avenue) Resurfacing from North Park Place to east of North Central Avenue 450336-1-52-01
| Project Details | |
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | US 92/SR 600/Hillsborough Avenue from north Park Place to east of North Central Avenue |
| Length | 1.1 miles |
| City | Tampa |
| County | Hillsborough |
| Road | Hillsborough Avenue SR 600 US 92 |
Contact Information
Design Manager
Michael MacKinnon
813-975-6431
Michael.MacKinnon@dot.state.fl.u
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
The purpose of this project is to preserve and extend the life of the existing pavement through resurfacing along this section of US 92 in Hillsborough County.
In addition to resurfacing, the project also includes sidewalk ADA upgrades.
Construction is currently anticipated to begin Winter 2026.